Dri-Eaz HVE3000 Manuel Du Propriétaire page 8

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Using the 3/8 in. socket, Remove bolts on both ends of
the cross-brace. Lift off brace.
Inspect float assembly. Check float and float shaft and
float switch arm for smooth operation. Clean as
necessary.
Fold up the pump handle and lift out the pump for
inspection. Rest the pump on a table or other stable
surface placed next to the unit. There is no need to
disconnect the wire harness.
07-01782K F479
8
Legend Brands, Inc.

Publicité

Table des Matières
loading

Table des Matières