Bibby Scientific Distinction D4000 Instructions De Montage page 3

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Location
The Distinction Water Still can be wall or bench mounted. Select a
convenient location which has access to the following services:-
Electricity Supply
Before connection please ensure that the line supply is suitable. The
Distinction Water Still is available in two models, model no. D4000
for supplies rated at 3kW, 220-240V 50/60 Hz single phase and
model no. D4000/Euro for supplies rated at 3kW, 200-230V,
50/60Hz, single phase. All units should be connected to the mains
supply via a double pole 30mA rCD isolating circuit breaker rated at
15A
Water Supply
A cold water supply capable of providing a minimum flow rate of
60 l/hr.
Drain
A waste water drain located below the level of the Still so that the
drain pipe can fall away straight without kinks or bends, to allow an
unimpeded flow. All water supplies and drainage systems should be
properly earth bonded.
Reservoir
A distillate collection reservoir should be located beneath the Still.
Assembly
1.
unpack the Still and identify the following components:-
Qty.
Component
1
Support Stand
1
Boiler
1
Condenser
1
Heating element
1
Hose kit
1
Gasket kit
1
Boiler thermostat tube
1
Condenser thermostat tube
2
Plastic connecting caps
2
Silicone rubber rings
1
P.T.F.E washer
1
reservoir level control
Figure 2 Heater and thermostat tube assembly
Catalogue No.
-
D4000/B
WC48/M2
D240H for D4000
D220H for D4000/Euro
W4000/HK
D4000/GK
WTT48
A515414
QC18/11
Qr18/7 and Qr18/10
QW18/7
WLS
40-45mm
Heater
Silicone
ring Plastic
Aluminium
plate
2.
remove the end cover from the electrical compartment by
undoing the retaining screws in the left hand panel.
3.
Take the metal stand and place in the desired location. Note
that 2 screw holes are provided for wall mounting. If wall
mounted the unit should be secured using 38mm (1.5"), No. 10
screws.
4.
Take the boiler, the heater and the gasket kit and assemble as
shown in figure 2.
i)
Place the bolts through the metal flange in the manner
shown and then place the metal flange over the tapered
glass tube of the boiler.
ii)
Take the plastic insert and bend it round the glass tube and
into the metal flange. Pull the flange and insert towards
the open end of the glass tube until the insert presses on
the glass.
iii)
Place the aluminium plate, followed by the silicone ring
over the heating element and locate approximately
40-45mm from the end with the electric cable, see fig. 2.
iv)
Insert the heating element through the tapered glass tube
and into the boiler – ensure that there is clearance at the
inside end and no danger of the end of the element
pressing against the end of the boiler.
v)
Insert the three bolts into the threaded holes in the
aluminium plate and evenly tighten. Check element is
secure and horizontal but do not over tighten bolts.
vi)
Ensure the heating element is horizontal within the boiler
5.
Take the two metal straps and attach the springs to the rear of the
"cradles" on the stand. Place the assembled boiler and element
onto the "cradle" of the stand. Slide the assembly along until the
protruding end of the element is located inside the electrical
compartment.
N.B. A "pip" on the bottom of the boiler locates in a hole in the
right-hand cradle.
Ensure that the boiler thermostat probe is located in the thermostat
tube.
Attach the free ends of the straps to the front of the cradle to
secure the boiler in place.
Boiler
thermostat
tube
Metal
insert
flange
Screwcap
Boiler
Tapered glass tube
Bolts
3

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Distinction d4000/euro

Table des Matières