Mitsubishi Electric CITY MULTI PAC-PH01EHY-E Manuel D'installation page 17

Table des Matières

Publicité

Step 2. Fastening the panel heater wirings
8
S-module
[Fig. 8.2.0.1]
<A> Run the panel heater wirings outside the unit. Wrap the supplied pipe cover around
the pipe so that the heat exchanger, refrigerant piping, and sheet metal edges are
out of contact with panel heater wirings located between the heat exchanger and
where indicated as <A> in the figure. Then fix the pipe cover and the wirings in
place with a cable tie.
<B> Re-place the main control box and the wirings.
A Panel heater wiring
B Main control box
[Fig. 8.2.0.2]
A
[Fig. 8.2.0.3]
B
<A>
A
B
<A> Run the panel heater wirings along with the strong electrical wiring in the back of the main control box, and fasten them
with cable straps.
A Strong electrical wiring
B Cable strap
C Panel heater wiring
8.2.0
B
A
<A>
B
<A>
<A> Remove the cover from the inverter control box by unscrewing the
three screws.
A Main control box
B Inverter control box
C
<B>
A
Pipe
Cable tie
Wiring fixing image
C
Pipe cover
Wire
A
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

City multi pac-ph02ehy-eCity multi pac-ph03ehy-e

Table des Matières