Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

DIP switch setting

S1.1 = ON
The drives will be closing only so long
as the ventilating button is pressed.
S1.1 = OFF
Pushing the ventilation button once
^
CLOSES the drives.
S1.2 = ON
The drives will be opening only so long
as the ventilating button is pressed.
S1.2 = OFF
Pushing the ventilation button once
OPENS the drives.
S1.3 = ON
The group plug-in can be moved into the CLOSED position with Zz signals.
S1.4 = ON
The group plug-in can be moved into the OPEN position with Az signals.
S1.5 = ON
Power failure-CLOSED. In the event of a mains failure, the drive closes.
S1.6 = ON
Ventilation time limitation
Using a potentiometer, ventilation time can be set.
Drives will automatically close again, after the adjusted time has expired.
Adjustment range from 2 to 45 minutes. Only if S1.1 = OFF!
S1.7 = ON
OPEN-running time limitation
Using a potentiometer, running time in OPEN direction can be limited.
If the vent button is actuated in OPEN direction, the drives will run OPEN
as long as the running time is set. Adjustment range from 2 to 60 seconds.
S1.8 = ON
OPEN-retriggering. The OPEN-running time limitation can be retriggered
S1.9 = ON
RWA-Nachtaktung eingeschaltet. The smoke vent is triggered for a duration of 20 minutes
in intervals of 2 minutes according to VdS 2581
S1.10 = ON
High sensitivity. All faults (see Page 3) are displayed immediately.
S1.10 = OFF
Faults are only displayed after 90s. Brief transmission errors are ignored.
S2.1 = ON
SHEV fast mode (HS) of drives in the event of an alarm.
ATTENTION! This function must only be used in conjunction with corresponding D+H high
speed drives.
If D+H drives without high speed or third-party drives are connected, activation can
destroy the drive!
S2.2 = ON
Group CLOSED in case of alarm. The drives/NSHEV's will be closing in case of alarm.
Cable lenghts and cross sections
M
-
ax. cable length 500 m
-
M
in. cable cross section 1.5 mm²
- A maximum voltage drop of 6.5% (3%
with third-party drives) on the cables is
permitted.
- Max. 45 drives can be connected to a
group
The following two formulas must always be
used to calculate cable cross sections. The
higher value must be used.
99.824.62 1.1/06/12
Delivery conditions
O N
1
2
3
Total power
200
consumption in VA
167
5 x 1,5 mm²
278
5 x 2,5 mm²
444
5 x 4,0 mm²
Formula 1:
Basic cable length (m) x Number all Drives
Cross section (mm²) =
Formula 2:
Einfache Leitungslänge (m)
Cross section (mm²) =
English
S1
4
5
6
7
8
9 1
0
Only if S1.1 = OFF!
500
800
1100
1400
1700
167
167
132
104
85
278
278
220
173
142
444
444
351
276
227
3220
111
GE 650 Set
S2
O N
1
2
15
30
min
2
45
20
40
sec
2
60
2000
2300
72
63
m
121
105
m
193
168
m
7/16

Publicité

Table des Matières
loading

Table des Matières