Siemens LI2USB Notice De Montage page 14

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 15
Installation
9. Connect up the air outlet pipe.
10. Connect the hood to the electricity
supply.
11. Stainless steel model:
Remove the protective film from the two
flue ducts.
Avoid damage to the sensitive
surface.
12. Screw the upper flue duct to the sides of
the fixing bracket with 2 short screws.
13. Position the lower flue duct on the
extractor hood, align the flue duct.
To prevent scratching the upper duct
when pushing on the lower duct, cover
the edge of the lower duct with the
installation template or other protective
material.
14. Re-insert the grease filter (see operating
instructions).
14

Publicité

Table des Matières
loading

Table des Matières