Maintenance And Inspection - Hitachi M 8V2 Instructions De Sécurité Et Mode D'emploi

Masquer les pouces Voir aussi pour M 8V2:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

English

MAINTENANCE AND INSPECTION

WARNING:
1. Inspecting the screws
Regularly inspect all screws and ensure that they are fully tightened. Should any of the
screws be loosened, retighten them immediately.
WARNING:
2. Maintenance of the motor
The motor unit winding is the very "heart" of the power tool. Exercise due
care to ensure the winding does not become damaged and/or wet with oil or
water.
3. Service and repairs
All quality power tools will eventually require servicing or replacement of parts because
of wear from normal use. To assure that only authorized replacement parts will be
used, all service and repairs must be performed by a HITACHI AUTHORIZED SERVICE
CENTER, ONLY.
4. Service parts list
CAUTION: Repair, modification and inspection of Hitachi Power Tools must be carried
out by a Hitachi Authorized Service Center.
This Parts List will be helpful if presented with the tool to the Hitachi
Authorized Service Center when requesting repair or other maintenance.
In the operation and maintenance of power tools, the safety regulations
and standards prescribed in each country must be observed.
MODIFICATIONS:
Hitachi Power Tools are constantly being improved and modified to incorporate the
latest technological advancements.
Accordingly, some parts may be changed without prior notice.
16
Be sure to switch power OFF and disconnect the plug from the
receptacle during maintenance and inspection.
Using this router with loosened screws is extremely dangerous.

Publicité

Table des Matières
loading

Table des Matières