Safety Clearance Zones; Marking Anchor Holes - Little Tikes 400Z Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

S A F E T Y
C L E A R A N C E
Z O N E S
1
Orient the unit in the area intended for the installation.
CAUTION: Ensure that at least 6' (2 m) of clear, unobstructed space
surrounds the unit in every direction. The safety "use" zone must be free of all
obstacles such as: trees, posts, fences, buildings, curbs, structures, etc.
TOTAL minimum space required 19ft (5.8 m) x 24ft. (7.3 m)
6' (2 m)
minimum
24' (7.3 m)
minimum
Overhead obstructions within the "use" zone shall not be within 84" (2.15 m) of the main platform. All overhead utility line clearances shall
comply with all local, state and national codes such as the National Electric Safety Code.
M A R K I N G
A N C H O R
H O L E S
WARNING:
• Observing the following statements and warnings reduces the likelihood of serious or
fatal injury.
• Unit must be properly anchored prior to use.
• Inspect product at regular intervals for wear or loose hardware. Remove from service if
any abnormal conditions such as cracks or breaks exist. Failure to perform periodic
checks could cause the anchored product to overturn or cause a fall.
• Anchors must be used on level ground.
• Anchors must be installed entirely below ground level to prevent children from tripping.
6' (2 m)
minimum
Once the 6' (2 m) safety "use" zone and 84" (2.15 m) overhead zone have been established,
mark the anchor areas as shown above. Mark holes as close to the unit as possible near the
anchor cabling holes in the climber. Carefully move the unit away from the marked holes and
proceed to "Anchoring the Unit" section.
5
6' (2 m)
19' (5.8 m)
minimum
minimum
6' (2 m)
minimum

Publicité

Table des Matières
loading

Table des Matières