1
2
3
1
8 mm
4
8 mm
4
English
Installation
Turn the water off at the main
before beginning!
Cut the plaster shield so that it extends ⅜" above the
surface of the finished floor.
Remove the flush housing screws using an 8 mm Allen
wrench (not included).
Do not discard the screws!
Remove the flush housing.
Position the tub filler on the rough (1).
Pivot the tub filler so that it faces the correct direction
().
Make sure that the tub filler is level ().
Install the 6 screws (the reserved screws from the
flush housing plus the included with the tub filler).
Tighten the screws using an 8 mm Allen wrench (4).