Versions And Mechanical Mounting; Commissioning; Prerequisites; Electrical Connection - ELMON 31-33 Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Safety Relais

5.3 Versions and mechanical mounting

Version ELMON rail 31‑33
Snap-on-rail version for mounting on 35-mm DIN rails in the switching box.

6. Commissioning

6.1 Prerequisites

When supplying with 12-24 V AC/DC, the voltage must comply with the requirements for safety low
voltage (SELV).
Cables installed outdoors or outside of the switching cabinet must be protected appropriately.

6.2 Electrical connection

Connect supply voltage 12-24 V AC/DC to terminals 12 24 V AC/DC or 230 V AC to terminals PE L1 N .
Connect the sensor to terminals X1 X2 .
Connect the control circuit that is to be monitored to terminals 13 14 according to the requirements.
Connect the test signal supplied by the primary control to the Test Signal terminals and select the
waveform via DIP slide switch S1.
Upon successful commissioning, safety output 13 14 is activated (relay contact "closed"). Actuation of the
sensor causes relay contact 13 14 to open .
16

Publicité

Table des Matières
loading

Table des Matières