VESUVIO VESIN10 Manuel D'installation Et D'utilisation page 29

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

BE机
Size(mm)
Model
VESIN36T
Above data is subject to modification without notice.
2.2.2. Heat pump installation.
① The frame must be fixed by bolts (M10) to concrete foundation or brackets. The
concrete foundation must be solid; the bracket must be strong enough and anti-rust
treated;
② The heat pump needs a water pump (Supplied by the user). The recommended pump
specification-flux: refer to Technical Parameter, Max. lift ≥10m
③ When the heat pump is running, there will be condensation water discharged from the
bottom, please pay attention to it. Please insert the drainage tube(accessory) into the
hole and clip it well, then connect a pipe to drain off the condensation water.
2.2.3. Wiring & protecting devices and cable specification
① Connect to appropriate power supply, the voltage should comply with the rated voltage
of the products.
② Well earth the heat pump.
③ Wiring must be connected by a professional technician according to the circuit
diagram.
④ Set breaker or fuse according to the local code (leakage operating current ≤ 30mA).
⑤ The layout of power cable and signal cable should be orderly and not affecting each
other.
Name
A
315
VESIN10
315
VESIN13
VESIN17
395
395
VESIN28
505
B
C
D
590
312
340
590
312
340
590
392
420
720
391
420
790
496
530
- 9 -
E
F
G
961
280
74
961
340
74
961
390
74
1092
620
74
1161
650
74
For users
H
658
658
658
958
958

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Vesin13Vesin17Vesin28Vesin36t

Table des Matières