Location; Free Room; Installation - Zanotti SB Série Notice De Mode D'emploi Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6.3

Location

To obtain optimal operation of the unit act as follows:
Note: SB units are equipped with automatic evaporation of defrost water;
drain is just a precaution in case of troubles.
6.4

Free room

When installing the unit leave enough free room to allow opening, correct use and easy maintenance in safe
conditions.
6.5

Installation

A) Prepare a opening with suitable dimensions in the cold room wall (see pictures above).
B) Fix the unit using the screws supplied.
24
A) Place the unit in a well ventilated room, far from heat sources.
B) Limit the number of door openings.
C) Make sure that the unit has good air supply and discharge.
D) Fit a drain line to the defrost water drain connection in the lower part of the unit.
Solution 1
Position the unit onto the cold room wall inserting the evaporator section in the opening.
Inject silicone on the whole
conveyor perimeter
i
e
Solution 2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sb1Sb2Sb3Sb4Sb5

Table des Matières