Instructions For Shipping Damage; Electrical Information - BKI Warming Station WS-13 Mode D'emploi

Table des Matières

Publicité

Warming Station

Instructions for Shipping Damage

You are responsible for filing all freight claims with the delivering truck line. Inspect all cartons and crates for
damage when they arrive. If there is damage noted to shipping crates or cartons, or, if a shortage is found, note
this on the bill of lading (all copies) before signing.
If damage is detected when the equipment is uncrated, immediately call the delivering truck line and follow up the
call with a written report indicating concealed damage to your equipment. Ask for an immediate inspection of your
concealed damage item. Crating material MUST be retained to show the inspector from the truck line.

Electrical Information

Il pourrait y avoir électrocution, défaillance du matériel ou dégâts matériels si l'installation
électrique est faite par un électricien non agréé. Veillez à ce qu'un électricien agréé
effectue l'installation conformément aux codes national et local.
This unit, when installed by an authorized BKI service agent, must be wired for use in accordance with all
applicable local, state, and federal codes. For specific electrical requirements and connections refer to the wiring
diagram attached to the unit or provided in the Service Manual.
Essayer d'installer ce four risque de causer des blessures graves ou la mort, ou
d'endommager l'équipement. Veillez à ce que ce soit un fournisseur de service autorisé
de BKI qui installe le four.
Installation
8
Installation

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Warming station ws-15stWarming station ws-15stc

Table des Matières