Publicité

Liens rapides

MODE D'EMPLOI
Warming Station
MODÈLES WS-13 and WS-15ST(C)
WS-13
WS-15STC
SS-OM-0417
9/2/2020

Publicité

Table des Matières
loading

Sommaire des Matières pour BKI Warming Station WS-13

  • Page 1 MODE D’EMPLOI Warming Station MODÈLES WS-13 and WS-15ST(C) WS-13 WS-15STC SS-OM-0417 9/2/2020...
  • Page 2 PIÈCES DE RECHANGE Les pièces FEO de l'usine BKI bénéficient d'une garantie de 90 jours sur les matériaux à partir de la date de l'installation par un centre de service agréé par l'usine BKI.
  • Page 3: Table Des Matières

    Warming Station Table of Contents Table of Contents Table of Contents ..............................3 Introduction ................................4 Précautions de sécurité ............................4 Signes et messages de sécurité ........................4 Pratiques d'interventions sûres .......................... 5 Étiquettes de sécurité ............................6 Installation ................................. 7 Instructions for Shipping Damage ..........................
  • Page 4: Introduction

    BKI. The BKI name and trademark on this unit assures you of the finest in design and engineering — that it has been built with care and dedication — using the best materials available. Attention to the operating instructions regarding proper installation, operation, and maintenance will result in long lasting dependability to insure the highest profitable return on your investment.
  • Page 5: Pratiques D'interventions Sûres

    étiquettes de sécurité sur cette unité. Si vous avez besoin d'étiquettes de sécurité neuves, obtenir le numéro de l'étiquette illustrée à la page 6, puis téléphoner au service technique BKI (802) 658-6600. En cas d'urgence Il est nécessaire de se préparer aux incendies, blessures et autres urgences...
  • Page 6: Étiquettes De Sécurité

    Warming Station Introduction Étiquettes de sécurité Models WS-13 On Back of Unit...
  • Page 7: Installation

    Warming Station Installation Model WS-15ST(C)
  • Page 8: Instructions For Shipping Damage

    This unit, when installed by an authorized BKI service agent, must be wired for use in accordance with all applicable local, state, and federal codes. For specific electrical requirements and connections refer to the wiring...
  • Page 9: Operation

    Warming Station Operation Operation Unit Startup and Preheating Once the unit is plugged in to the appropriate receptacle with the appropriate overcurrent protection (see rating tag), press the “I” portion of the power switch. Switch will illuminate, and the unit will begin to heat. IMPORTANT: Allow 20 minutes to preheat before loading product into Warming Station.
  • Page 10: Maintenance

    Warming Station Maintenance Maintenance Le non-respect de l’entretien indiqué ci-dessous pourrait donner lieu à un accident grave ATTENTION ou endommager l’équipement. Il pourrait y avoir électrocution, défaillance du matériel ou dégâts matériels si l’installation électrique est faite par un électricien non agréé. Veillez à ce qu’un électricien agréé effectue l’installation conformément aux codes national et local.
  • Page 11: Troubleshooting

    Product temperature is Make sure product is above 160° F when loaded. temperature too low when loaded. Faulty component in Contact an authorized BKI service agent for heating circuit corrective action. Unit is not heating No power to unit Make sure power cords are connected and circuit breaker is on.
  • Page 12 42 Allen Martin Drive, Essex Junction, VT 05495, USA http://www.bkideas.com Made and printed in the U.S.A...

Ce manuel est également adapté pour:

Warming station ws-15stWarming station ws-15stc

Table des Matières