Zehnder Pumpen Kompaktboy Duplex 1,1 D 400V Mode D'emploi page 79

Masquer les pouces Voir aussi pour Kompaktboy Duplex 1,1 D 400V:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Component
Pump control
Centrifugal pump
Accessories (if present)
Complete plant
Operating company
!
The above listing does not claim to be complete. The lifting unit could be installed in en-
vironments, for example, which requires careful and frequent maintenance.
Kompaktboy Single
Activity
• Check the power supply
• Check the condition/function of the indicator lights and operating
elements
• Check of the alarm equipment for function and effect
• Check tightness of fuses
• Retighten terminal connections
• Check switching points during test run
• Visually check the cable gland
• Clean motors outside
• Check of direction of rotation
• Check winding resistances
• Check insulation resistances
• Check of current consumption from the motor
• Check pump for blockage
• Check venting line - clean, if necessary
• Check for smooth running of pump/motor
• If necessary, fill up/change oil of the Intermediate chamber
• Check manual membrane pump for functionality
• Check cellar drainage pump for functionality
• Checking the mains-independent alarm system and replacing the
accumulators according to manufacturer specifications
• Test run of several switching cycles
• Consultation and/or training of the operating personnel
• If necessary, enclose the operating manual
en English
79

Publicité

Table des Matières
loading

Table des Matières