Powering Up The Systems - Belkin OmniView SMB CAT5 F1DP104Aea Manuel De L'utilisateur

Kvm switch;
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 53
Installation

Powering Up the Systems

Verify that all servers connected to the SMB CAT5 KVM Switch are powered on.
If any connected servers have not been powered on, it is okay to do so at this
time (servers can be powered on simultaneously). The SMB CAT5 KVM Switch
emulates both a mouse and keyboard on each port and allows your server to
boot normally.
The server connected to Port "1" will be displayed on the monitor. Check that the
keyboard, monitor, and mouse are working normally. Check all occupied ports to
verify that all servers are connected and responding correctly. If you encounter
an error, check your cable connections for that server and reboot. If the problem
persists, please refer to the "Troubleshooting" section in this User Manual.
28
28

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Omniview smb cat5 f1dp108aeaOmniview smb cat5 f1dp116aea

Table des Matières