First Starting Up; Circulation Pump; Low Temperature Appliance Setting; High Temperature Appliance Setting - Riello BAG2 MIX CLIMA Mode D'emploi

Masquer les pouces Voir aussi pour BAG2 MIX CLIMA:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

FIRST STARTING UP

Before switching the
BAG
electrical and plumbing connections have been formed
correctly.
During testing, the temperatures can be checked due to
the two thermometers shown in the figure.
CIRCULATION PUMPS
2
The BAG
MIX BASIC is supplied with circulation units with
a three-speed control.
Choose the best speed to suit the specific characteristics
of the systems.
RELEASING THE PUMPS IF NECESSARY
If the unit has been inactive for a lengthy period of time
and the circulation units are stuck, unscrew the caps on
the front and turn the shaft for the circulation unit motor
using a screwdriver.
Do this extremely carefully so as not to damage the com-
ponents themselves.

LOW TEMPERATURE APPLIANCE SETTING

LOW TEMPERATURE APPLIANCE SETTING
LOW TEMPERATURE APPLIANCE SETTING
LOW TEMPERATURE APPLIANCE SETTING
LOW TEMPERATURE APPLIANCE SETTING
The supply temperature to the low temperature plant may
be set by regulating the trimmer on the board.
POS
1
2
T (°C)
25
30

HIGH TEMPERATURE APPLIANCE SETTING

HIGH TEMPERATURE APPLIANCE SETTING
HIGH TEMPERATURE APPLIANCE SETTING
HIGH TEMPERATURE APPLIANCE SETTING
HIGH TEMPERATURE APPLIANCE SETTING
Fix the boiler central heating knob to the high tempe-
rature appliance desidered value.
22
2
MIX CLIMA
on, check that the
3
4
5
35
40
45
HEATER ANTI FREEZE FUNCTION FOR LOW
TEMPERATURES
The function is activated when the temperature measured
by the supply probe falls below 5°C. A heat request is
generated at this phase and the low temperature circuit
pump is run for 15 minutes.
PUMP ANTI BLOCK FUNCTION
The pump is activated once every 24 hours for a period of
10 seconds.
Fig. 4

Publicité

Table des Matières
loading

Table des Matières