Télécharger Imprimer la page

enervent eAir Guide De Démarrage Rapide page 4

Masquer les pouces Voir aussi pour eAir:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 6
VERY IMPORTANT – DO NOT TURN ON THE POWER ON THIS DEVICE!
TO FUNCTION CORRECTLY THE PANEL HAS TO BE INITIALISED AND
INSTALLED BY YOUR CONTRACTOR.
Follow these steps:
Read the accurate instructions from the installation manual if you are installing a second control panel in
addition to an excisting one.
1. Connect the ventilation unit to the wall mounting bracket with the cable.
Connect the sensor to the wall mounting bracket.
2. Install the wall mounting bracket on the wall mounting box.
3. Install the battery in the eAir control device and place it in the wall mounting bracket.
4. Switch on the power of the ventilation unit – the eAir control device starts
automatically. The battery will start charging.
5. The Ensto logo appears on the display. The wireless connection is established
between the eAir control device and the wall mounting bracket. Wait for the text:
"Welcome to Setup Wizard" (it appears in about 2 minutes).
6. The Setup Wizard is a step-by-step installation program. It is essential that you use it:
the program takes you through all the required settings to initialise the ventilation unit.
7. Press "Next" and choose your language.
8. Follow the instructions of the Setup Wizard.
9. Only do changes on the menus when needed.
10. In case the Setup Wizard is aborted, you can easily return to it on the bottom edge of
the display: » Settings » Settings menu » Setup Wizard
IMPORTANT! Specified instructions and schemes are in the separate Instruction Guide.
See the image on the cover
1. eAir control device
3. Sensor. Note! Extra equipment.
4. Cable
2. Wall mounting bracket
5. Battery

Publicité

loading