This information is intended to allow
the user to make a better estimation
of the hazards and risks involved.

4.3 Dust emission

The planer thicknesser has been dust
emission inspected.
JPT-260, JPT-310:
At an air velocity of 20 m/s on the dust
port dia 100mm:
Vacuum pressure
Volume flow
JPT-410:
At an air velocity of 20 m/s on the dust
port dia 120mm:
Vacuum pressure
Volume flow
The machine meets a workplace dust
emission limit of 2 mg/m³.
4.4 Content of delivery
Planer thicknesser assembly
Jointer fence assembly.
Cutter block guard
Knife setting gauge
Operating manual
Spare parts list
4.5 Machine description
Fig 1
A....Outfeed table
B....Jointer fence
C....ON/OFF switch
D....Cutterblock guard
E.....Table tilt handle
F....Table adjustment lock
G....Table adjustment handle
H....Infeed table
I.....Table-cabinet lock
J.....Mains plug
900 Pa
565 m³/h
K....Thickness table
L....Power feed ON/OFF handle
950 Pa
M....Thickness table lock
810 m³/h
(JPT-310, JPT-410)
N....Thickness table adjust handwheel
O.....Dust hood
P.....Dust hood disengagement knob

5. Transport and start up

5.1 Transport and installation

For transport use a forklift or hand
trolley. Make sure the machine does
not tip or fall off during transport.
Remove the carriage blots and slide
the machine carefully off the pallet.
ATTENTION:
The planer tables are precisely aligned
ex. works. They may only be loaded
when they are closed and the table-
cabinet locks (I, Fig 1) are engaged,
otherwise they may be damaged.
The machine is designed to operate in
closed rooms and must be placed
stable on firm and levelled ground.
The machine can be bolted down if
required.

5.2 Assembly

If you notice any transport damage
while unpacking, notify your supplier
immediately. Do not operate the
machine!
Dispose of the packing in an
environmentally friendly manner.
Clean all rust protected surfaces with
a mild solvent.

5.3 Mains connection

Mains connection and any extension
cords used must comply with
applicable regulations.
Fig 2
6
The mains voltage must comply with
the information on the machine
licence plate.
The mains connection must have a
16A surge-proof fuse.
Only use connection cables marked
H07RN-F
Connections and repairs to the
electrical equipment may only be
carried out by qualified electricians.
ATTENTION:
-Check first if the cutter block runs
freely and if all safety devices are
fitted before starting the machine.
- If the direction of rotation is not
correct, the phase converter inside the
CCE Euro plug must be pushed in and
turned 180°.
(See rotation arrow on machine for
correct rotation)

5.4 Dust connection

Before initial operation, the machine
must be connected to a dust extractor.
The suction should switch on
automatically when the jointer is
switched on.
The flow rate on the suction port must
be 20m/sec.
Flexible hoses must be of non-
flammable quality, and must be
connected to the machine ground
system.

5.5 Starting operation

You can start the machine with the
green on button. The red button on the
main switch stops the machine.
The power feed can be engaged and
disengaged with handle (L, Fig 2).
In case of machine overload the motor
overload cut-off will react.
After appr.10 min of cooling the
machine can be started again.

6. Machine operation

Change of operating mode (planing
to thicknessing and back) may only
be performed when the machine is
at a complete standstill.