3M BPEO Taille 0 Instructions De Montage page 3

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. Mid Span Double cable entry operation
6.1 Double cable entry is sealed for possible use of independent single cable entry ECAM S12
Open the cable entry by knocking briefly on the screwdriver.
Remove all plastic flash form the punch out area (avoid, use knife or
abrasive) before inserting the ECAM cable entry.
The cable entry tube should be perfectly clean before inserting the cable
entry.
For the preparation of the single cable entry ECAM S12.
Please refer to the relevant instruction.
6.2 Installation of the uncut cable (mid span) entry ECAM D6-18
Remove the blocking tap by pushing the 2 latches located on the tap inside the closure.
Then push to remove the blocking tap.
For the preparation of the mid span double cable entry ECAM D6-18. please refer to the relevant instruction.
1
2
Push
Cables Preparation (Reminder)
Simple cable entry: Remove the cable sheath over
1,10m (fig. 14).
14
7. Installation / Coiling the slack tubes or micro modules
Please insert the double cable entry with the latch oriented to the top as
it will support the storage (coiling up) of the slack tubes.
The bundle of slack micro modules has to be installed at the rear of
the closure.
Push
1,10 m
Double entry: M
ake a window cut by removing
over 2,20m (fig. 15).
This length is applicable to any double entry from the 3M BPEO
range of products.
15
3
the cable sheath
2,20 m