Dell YC588 Guide D'installation page 36

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 44
3 Remove the bracket and then place the bracket on either the 7.62-cm or 15.24-cm (3-inch or 6-inch)
wide flush-mount threaded studs (see Figure 2-5).
4 Using the two nuts that you removed in step 2, tighten the nuts finger tight to secure the adjustable
mounting bracket (see Figure 2-5).
5 Repeat step 2 through step 4 to configure the other mounting rail.
Figure 2-5. Configuring the Adjustable Mounting Bracket for Flush-Mount Installation
4
1
nuts (2 per bracket)
4
flush-mount mounting flange
6 Holding the left mounting rail at the location you marked, position the flush-mount mounting flange
against the front of the vertical two-post rack and secure it to the two-post rail with two 12-24 x
0.5-inch pan-head Phillips screws (see Figure 2-6).
34
Two-Post Rack Installation
1
2
3
2
adjustable mounting bracket
3
7.62-cm (3-inch) wide, flush-
mount, threaded studs

Publicité

Table des Matières
loading

Table des Matières