Haier HCR2250AGS Instructions D'installation page 19

Masquer les pouces Voir aussi pour HCR2250AGS:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CONNECT GAS LINE FROM GAS PRESSURE REGULATOR TO GAS SUPPLY:
1. Apply pipe-joint compound made for use with LP gas to the tapered (NPT)
threads of both adapters
2. Attach one adapter to the gas pressure regulator and the other to the gas
shutoff valve and tighten both.
NOTE: Do Not rotate the gas pressure regulator.
3. Attach the flexible gas line
IMPORTANT: All connections must be wrench tightened (requires two 10"
adjustable wrenches). Do not over-tighten the connections to the gas pressure
regulator. Overtightening may crack the regulator creating a leak.
COMPLETE CONNECTION
1. Open the manual shutoff valve in the gas supply line. The valve is open when the
handle is parallel to the gas pipe.
2. Test all connections by brushing on an approved noncorrosive leak-detection
solution. If bubbles appear, a leak is indicated. Correct any leak found.
supplied with gas line kit.
d
to adapters
c
e
a
d
c
b
d
, one adapter at each end.
d
a
Adapter (provided)
b
Gas Pressure Regulator
c
Gas Supply Line
d
Adapters (From Gas
Supply Line Kit)
e
Gas Shutoff Valve
17

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Hcr6250ags

Table des Matières