Preventing Equipment From Falling Over - Pioneer PDK-TS03 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 20

Preventing Equipment from Falling Over

After installing the stand, make sure to take measures so that the equipment will not fall over.
7 Stabilizing to the floor
¶ Stabilize the equipment using screws that are available on
the market.
For stabilizing the equipment against the floor, use
screws that have a nominal diameter of 6 and that
Note
are at least 20mm (25/32 inch) long.
5 mm (0.2 inch)
or less
¶ Positions for inserting screws for stabilizing equipment against the floor
(without speakers, in the following diagram)
Units: mm (inch)
16
20mm (25/32 inch)
or more
166 (6-17/32)
7 Using a wall for stabilization
(50" display model is shown in the figure.)
1.
Attach the stabilization bolts that come with the plasma
display.
2.
Use strong cords or chains to completely stabilize the
equipment against a wall, pillar or other sturdy element.
(Repeat the same steps in the laterally direction to stabi-
lize the assembly to the left and right.)
Use hooks and cords or chains and fittings that
are available on the market.
Note
Recommended hook: nominal diameter, 8; length,
12-15mm (15/32 inch)
1
Hook
2
Cord or chain
Fitting
518 (20-13/32) [50" display]
444 (17-1/2) [43" display]
12–15mm
(15/32 inch)
(50")
(43")

Publicité

Table des Matières
loading

Table des Matières