Atom AXIS V2 Manuel D'utilisation Et De Maintenance page 3

Table des Matières

Publicité

6 - insPection and Maintenance
Lire, suivre, appliquer les avertissements , recommandations, et instructions de ce manuel
Manuel d'utilisation et de maintenance Atom AXIS V2 - Edition 10 - Décembre 2008
3.2 - FXC Model 12000 installation
5.2 - Connecting the short mini-risers and braking
5.3 - Connecting the risers V3 version and braking
5.4 - Deployment bag and main pilotchute assembling
5.5 - Main closing loop installation
5.6 - Stowing lines on the deployment bag
5.7 - Setting the deployment bag into the main container
5.8 - Closing the container with throw away pilotchute
5.9 - Closing the main container with pull-out pilotchute
5.10 - Routing the webbings through the hardwares
6.1 - Introduction
6.2 - Periodicity of maintenance procedures and packing
6.3 - Storage in normal conditions
6.4 - Maintenance and packing operations
6.5 - User check-list before jump
6.5 - Spare parts and accessories
PARACHUTES DE FRANCE AERAZUR
contents
Read and follow all WARNINGS, WARRANTY, INSTRUCTIONS for products of this manual.
4
5
6
7
9
12
13
16
21
23
23
25
26
28
31
34
37
43
45
46
48
51
54
56
59
59
60
62
65
3/68

Publicité

Table des Matières
loading

Produits Connexes pour Atom AXIS V2

Table des Matières