Helios AIR1-KR DX Série Notice De Montage Et D'entretien page 30

Masquer les pouces Voir aussi pour AIR1-KR DX Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation and Operating Instructions
EN
Cooling register AIR1-KR DX
11. Open the terminal box cover and check the cable thickness for the signal connection.
– Connect the cable to the terminals and close the terminal box cover. The cable connections can be found in the
wiring diagram (SS-1353).
– Connect the other end of the cable from the cooling module terminal box to the corresponding terminal in the
unit terminal box (see wiring diagram SS-1353).
12. The following connections between the cooling register terminal box and the AHU-Kit must be used:
– Terminals 1-2: Start contact (DO) (always required)
– Terminals 11-12: Alarm signal (DI) (always required)
The DX cooling register can be controlled as a 1-stage digital signal DO, 2-stage digital signal DO or as a propor-
tional signal AO (0-10 V). The terminal connections can be found in wiring diagram (SS-1353).
13. After installation of the cooling register, adjust the settings in the commissioning assistant. In this respect, observe
the corresponding chapter in the installation and operating instructions for the respective AIR1 ventilation unit.
The 1-stage DO- or 2-stage DO-control mode must be configured in the commissioning assistant. If the propor-
tional control signal AO (0-10 V ) is used, the 1-stage digital output DO must be selected in the commissioning
assistant.
13

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Air1-kr dx xc 500Air1-kr dx xc 700Air1-kr dx xc 1400Air1-kr dx xc 2200Air1-kr dx xc 3200Air1-kr dx xh 1000 r ... Afficher tout

Table des Matières