Assembly conditions for a weka assembly team
If you wish for help assembling your cabin and choose to employ a weka assembly team, weka Holzbau GmbH will
carry out the following services for you:
Assembly means putting together (installation) of the individual parts supplied. It does not include treating them
with a wood protection agent, the delivery and assembly of accessories and accessory parts. Electrical connections
are not included in the assembly service.
The items to be assembled must be located at the installation site/location/base area. Transport of the article or the
individual parts over a distance greater than 5 m or to another level is not included in the assembly price quoted.
The substrate must be stable, horizontal and level.
In the event of doubt, reference should be made to DIN 18202 'Level tolerances in building construction', tab. 3,
row 3, with a maximum height difference at the furthest points of approx. 10 to 11 mm.
All preparatory work must have been carried out in accordance with the technical regulations before assembly
begins. The substrates/floors/foundations constructed or selected by you must be suitable for the assembly.
You should have the following tools to hand before beginning assembly.
Spring tape
Spirit level
Mitre saw/
hand disk saw
Abbreviations / Symbols
cm
-
mm
-
ca.
-
Abb.
-
-
-
-
GTK
Technische. Änderungen vorbehalten!
measure
Drill
Universal cutter
Centimetre
Millimetre
approximately/approx.
Figure
Supply air
Outgoing air
Not included in delivery!
HT
TMS
Elektric
screwdriver
Spanner
 Copyright weka-Holzbau GmbH, Neubrandenburg
6
Hammer
Rubber mallet
Allen key
Screwdriver
-
Design variant

Publicité

loading