Télécharger Imprimer la page

General Safety Instructions; Electrical Connections; Installation And Commissioning; Hydraulic System - VIPool MJB Série Guide De L'utilisateur

Publicité

GB
This document contains some very important information for the safety of individuals and of property, as
well as on how to commission the pump. The user and installer must under all circumstances familiarise
themselves with the information contained herein prior to installing and commissioning the device.
Please keep this reference document at hand.
1. MEANING OF THE SYMBOLS USED HEREIN
DANGER
Risk of electrocution
DANGER
Risk of personal injury
WARNING
Risk of pump and system deterioration

2. GENERAL SAFETY INSTRUCTIONS

The instructions listed below are purely indicative and in no way limited. The pump must
always be handled with the utmost care.
▪ The pump was designed for use in a closed swimming pool filtering circuit, in clean water at a
temperature of less than 35° C.
▪ Do not modify the pump in any way; the guarantee will automatically be invalidated in the event
of a pump modification.
▪ For all repair work, only use spare parts supplied by the manufacturer; the latter will not be held
liable in the event of damage caused by the use of non original spare parts or parts which have
been modified without prior approval of the manufacturer.
▪ The safety and correct operation of the pump are guaranteed only if all the installation and com-
missioning instructions have been followed.
▪ The pump must be installed in compliance with the applicable standards in force in the country
of installation and use, especially HD 384.7.702; we recommend you contact a professional for the
pump installation.
▪ Cut off the electricity supply to the pump prior to any intervention.
▪ The limits specified in the technical data table must never be exceeded under any circum-
stances.
▪ In the event of a malfunction or failure, please contact your nearest manufacturer's representa-
tive or the manufacturer's Technical Support Service.
▪ Hot surface in the area around the motor

3. INSTALLATION AND COMMISSIONING

▪ Never operate the pump without the prefilter.
▪ Never operate the pump without any water.
▪ Your pump is fitted with a prefilter basket designed to collect any large impurities which could
damage the turbine.
▪ To ensure the correct operation of the pump:
- Always operate the pump with the prefilter in place,
- The pump must be installed horizontally and secured in place.
▪ Its performance is optimised if the pump is positioned below the swimming pool's water level.
▪ If the pump has to be installed above the swimming pool's water level, the height must not ex-
ceed 1,5 m and the length of the suction pipe will have to be as short as possible in order to avoid
significant suction times and pressure losses (diagram no. 1).
▪ For the correct air circulation and to ensure effective cooling, the fan grid must be located more
than 30cm from a wall .
6
GB
Diagram no. 1

3.1 ELECTRICAL CONNECTIONS

▪ Make sure the electricity supply voltage and frequency correspond to the values specified on the
pump data plate.
▪ The pump's electrical system must be fitted with a differential guard with a value of no more than
30mA.
▪ When wiring the pump motor terminal board, make sure the electrical terminals are tightened
properly and make the earthing connection correctly.
▪ Check that the adjustment of the thermal relay in the electrical cabinet matches the pump motor
intensity in order to ensure the effective protection of the latter (see the pump data plate).
▪ Single-phase pump terminal board
▪ In the event of a three-phase motor: make sure the motor is revolving clockwise (looking at the
fan - see the arrow on the top of the fan).
▪ Neither the motor nor any of the live parts must come into contact with water.
▪ Make sure the electrical wires are sheathed.
▪ Check the correct positioning of the cable at the terminal board input in order to avoid any water
seeping in through the wire passage.

3.2 HYDRAULIC SYSTEM

▪ Connect the pump to the swimming pool's hydraulic circuit using the couplings provided.
▪ To connect the pipes to the pump, the joints are supplied with O-rings which must under all cir-
cumstances be used.
▪ The pipes must be connected to the couplings and glued in place.
▪ The delivery pipe must be fitted at a right angle and perfectly centred with respect to the outlets
to be connected, so as to avoid the pump and pipe from being
subjected to external stresses which could cause them to
break, irrespective of the assembly operations. We recommend
a vertical pipe length of approx. 60cm to facilitate the priming
of the pump.
▪ A slight tilt of the suction pipes (2%) will prevent any air
pockets from forming.
Max : 1,5m
▪ Three-phase pump terminal board
7

Publicité

loading

Ce manuel est également adapté pour:

Mjb 6mMjb 6tMjb 10mMjb 10tMjb 14mMjb 14t ... Afficher tout