cascade corporation F Série Instructions D'installation page 7

Masquer les pouces Voir aussi pour F Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 32
I
NSTALLATION
4
Flush hydraulic supply hoses
A
Install hoses as shown.
B
Operate auxiliary valves for 30 sec.
C
Remove union fittings.
D
Install hoses to Roll Clamp fittings as
shown in Step 3 above.
5
Check oil level and remove
rubber vent cover
Level must
be up to
fill plug hole.
6
Mount Clamp on truck carriage
A
Center truck behind Roll Clamp.
B
Tilt forward and raise carriage into position.
C
Engage top mounting hooks with carriage.
25F – Make sure the centering tab engages
the center notch on top carriage bar.
38F-160F – Make sure locator tab in left hook
engages closest notch on top carriage bar.
D
Lift Clamp 2 in. (5 cm) off pallet.
ITA Class II – 0.60-0.66 in. (15-17 mm)
ITA Class III – 0.72-0.78 in. (18-20 mm)
ITA Class IV – 0.72-0.78 in. (18-20 mm)
ITA Class II – 0.32-0.36 in. (8-9 mm)
ITA Class III – 0.39-0.43 in. (10-11 mm)
ITA Class IV – 0.47-0.51 in. (12-13 mm)
781578-R3 EN
25F
RR0068.eps
Remove rubber
vent cover.
If necessary, fill gearbox with Cascade
Gear Lube 656300 or equivalent SAE 90
wt. gear lube (AGMA 'mild' 6EP Gear Oil).
Class II carriage bars
and upper mounting
hooks shown.
Engage hook
Notch
locator tab in
carriage notch
Upper Carriage Bar
GA0079.eps
38F–160F
Level must
be up to
fill plug hole.
RC0139.eps
25F
Centering Tab
RC0723.eps
Remove rubber
vent cover.
RC1817.eps
Connect hoses to
end block before
clamp installation.
Center Spacer
5

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

25f38f clamp45f60f66f77f ... Afficher tout

Table des Matières