Integral Ventilator Installation - Dcs Es36 Installation Guide

Table des Matières
Les langues disponibles

Les langues disponibles

INSTALLATION

INTEGRAL VENTILATOR INSTALLATION

The Integral ventilator can be mounted to discharge air as shown in Figure 9. From the inside of the
hood, slip motor into the bracket on the left. Rotate motor upwards until it snaps into the spring clip
on the right.
IMPORTANT:
Secure the motor to the hood with the machine screw and lock washer.
WIRING THE HOOD:
WARNING:
Turn off electricity at the service panel before wiring the unit.
Branch circuit requirement is 120V, 60Hz, 15A (minimum).
1. Connect the Integral Ventilator molex plug
connector to the connector present inside the
hood as shown in Figure 9 or Figure 10.
2. Remove the j-box cover as shown in Figure 11.
3. Remove 1 of 2 knockouts and install 1/2" conduit
connector in j-box.
4. Run black, white, and green wires (#18 AWG) in
1/2" conduit from power supply to j-box.
5. Connect the black to black (hot line) wire, white to
white (common line) wire and green/yellow wire
to ground in j-box cover.
6. Close j-box cover.
7. For ES36 only: mount the filter trim bracket
supplied on the right side of the hood. Check that
all engage points perfectly match, then fix with 3
screws as shown in figure 12.
Final installation steps
Replace filters and grease trays as described in the
Use & Care manual. Turn power on at service panel.
Check operation of the hood.
FIG. 12
Bracket
SCREW
LOCATIONS
From
control
panel
15
Integral ventilator
fixing point
Motor
Motor
support
Spring clip
connector
FIG. 9
From Control
Panel
Motor connector
FIG. 10
Power
supply
conduit
FIG. 11

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Dcs es30Dcs es36Dcs vs1236Dcs vs30Dcs vs36Dcs vs48

Table des Matières