Télécharger Imprimer la page

Extraflame UPPER LOADING KIT Manuel D'instructions page 17

Les langues disponibles
  • FR

Les langues disponibles

FRONT INSTALLATION ON 10 ° INCLINED WALLS
THE MAXIMUM AND MINIMUM VALUES ARE VALID WITH A 600 MM LONG FLEXIBLE TUBE AND A FRONT WALL INCLINED BY 10°.
ASSEMBLING THE KIT
1
Assemble the bearing structure of the kit on the base.
ENGLISH
17
17
loading