Celexon Fixed-10035 Manuel D'utilisation page 13

Table des Matières
Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 17
ASSEMBLY
STEP 1:
Remove the packaging and film residues from the product before installation.
STEP 2:
Use the frame as a template to mark six holes on the installation wall. Drill the
marked holes Ø10 mm and 50 mm deep into the wall. Then countersink the
plastic plugs (B) into each hole.
Attention: The enclosed mounting material is only suitable for mounting
on solid stone walls. Obtain suitable mounting material for your supporting
structure.
Wall
B
4
Table des Matières
loading

Produits Connexes pour Celexon Fixed-10035

Table des Matières