Page 1
OPD811 1100 LB HYDRAULIC DUMP CART WITH CARRY-ALL BUCKET ELECTRIC DRIVE • HYDRAULIC DUMP • ALL-TERRAIN TIRES ASSEMBLY GUIDE DK2 USA WEST DK2 CORPORATE HEAD OFFICE DK2 USA EAST 4301 S VALLEY VIEW BLVD. 5330 MAINWAY 3750 SOUTH AVENUE, SUITE 10-11 LAS VEGAS, NEVADA...
Page 4
STEP 1: INSTALLING BOTH WHEELS NOTE: UPON INSPECTION OF PARTS IF YOU FIND ANY DAMAGED OR MISSING PARTS PLEASE CALL DK2 POWER AT 702-331-5353 OR CONTACT US VIA OUR WEBSITE WWW.DK2POWER.COM WE WILL REPLACE ANY MISSING PARTS TO YOU FREE PLEASE DO NOT RETURN TO THE STORE 4 | OPD811 man.
Page 5
ASSEMBLY STEP BY STEP INSTRUCTIONS STEP 2: PINNING THE LIFT ROD Tip bucket forward. Pin the lift rod. PIN THE LIFT ROD OPD811 man. v.210223 | 5...
Page 6
ASSEMBLY STEP BY STEP INSTRUCTIONS STEP 3: ASSEMBLING THE AXLE AND NUT ASSEMBLE AXLE & NUT 6 | OPD811 man. v.210223...
Page 7
ASSEMBLY STEP BY STEP INSTRUCTIONS STEP 4: INSTALLING THE HANDLES Install the right handle assembly with 4 bolts. Install the left handle assembly with 4 bolts. 4 BOLTS EACH SIDE OPD811 man. v.210223 | 7...
Page 8
ASSEMBLY STEP BY STEP INSTRUCTIONS STEP 5: REMOVING THE WET BUCKET YOUR UNIT IS ALSO EQUIPPED WITH A CARRY-ALL. TIP WET BUCKET FORWARD AND REMOVE BOLTS. SLIDE BUCKET OFF. REPLACE WITH CARRY-ALL. REMOVE BOLTS 8 | OPD811 man. v.210223...
Page 9
INSERT DUMP GATE END BETWEEN THE 2 POSTS. BOLT THE END POSTS INTO PLACE. BOLT THE REAR PANEL INTO PLACE. ASSEMBLE SIDES WITH HINGES, FOLD CLOSED AND LATCH. USE YOUR CARRY-ALL TO HAUL BOARDS, FEEDBAGS, CONCRETE BAGS, GRAVEL, DIRT AND MORE. OPD811 man. v.210223 | 9...
Page 12
OPERATION PROPER USE GUIDELINES OPERATIONAL CONTROLS TURN ON THE MACHINE. FORWARD AND REVERSE CONTROLS BUCKET LIFT BRAKE 12 | OPD811 man. v.210223...
Page 13
STAY CLEAR OF THE FRAME WHEN BUCKET IS CLOSING. USE ONLY THE CHARGER PROVIDED TO CHARGE YOUR UNIT. WEAR PROTECTIVE FOOT WEAR AND TAKE CAUTION WHEN OPERATING ON UNLEVEL OR SLIPPERY GROUND. NEVER LET CHILDREN OPERATE THIS EQUIPMENT. OPD811 man. v.210223 | 13...
Page 15
Left short rod Rear wheel frame 17 x dia. 11 x dia. 15 spacer M16x95 screw Shocking reduction Rear wheel Main frame cover Right main frame cover plate Rear wheel frame Left main frame cover plate OPD811 man. v.210223 | 15...
Page 16
MAINTENANCE PARTS DIAGRAM 16 | OPD811 man. v.210223...
Page 19
(1) year from the date of the original purchase. If one (1) year from the original date of purchase this OPD811 fails due to defect in material or 1-year parts only warranty no labor.
Page 20
This page has been left blank intentionally.
Page 21
OPD811 CHARIOT À BENNE HYDRAULIQUE DE 1100 LB AVEC BENNE PORTATIVE ENTRAÎNEMENT ÉLECTRIQUE • BENNE HYDRAULIQUE • PNEUS TOUT TERRAIN GUIDE DE MONTAGE DK2 USA OUEST SIÈGE SOCIAL DK2 CORPORATIF DK2 USA EST 4301 S VALLEY VIEW BLVD. 5330 MAINWAY...
Page 24
INSTRUCTIONS ÉTAPE PAR ÉTAPE ÉTAPE 1: INSTALLATION DES ROUES REMARQUE: LORS DE L’INSPECTION DES PIÈCES SI VOUS TROUVEZ DES PIÈCES ENDOMMAGÉES OU MANQUANTES VEUILLEZ APPELER DK2 POWER AU 702-331-5353 OU CONTACTEZ-NOUS VIA NOTRE SITE WEB WWW.DK2POWER.COM NOUS REMPLACERONS TOUTES LES PIÈCES MANQUANTES GRATUITEMENT VEUILLEZ NE PAS RETOURNER AU MAGASIN 24 | OPD811 man.
Page 25
ASSEMBLAGE INSTRUCTIONS ÉTAPE PAR ÉTAPE ÉTAPE 2: INSTALLATION DES GOUPILLES ET TIGE DE BENNE Inclinez la benne vers l’avant. Installez la tige de levage. INSTALLEZ LA TIGE DE LEVAGE. OPD811 man. v.210223 | 25...
Page 26
ASSEMBLAGE INSTRUCTIONS ÉTAPE PAR ÉTAPE ÉTAPE 3: ASSEMBLAGE DE L’ESSIEU ET DE L’ÉCROU ASSEMBLER L’ESSIEU ET L’ÉCROU 26 | OPD811 man. v.210223...
Page 27
ASSEMBLAGE INSTRUCTIONS ÉTAPE PAR ÉTAPE ÉTAPE 4: INSTALLATION DES POIGNÉES Installez la poignée droite avec 4 boulons. Installez l’ensemble de poignée gauche avec 4 boulons. 4 BOULONS DE CHAQUE CÔTÉ OPD811 man. v.210223 | 27...
Page 28
ÉTAPE 5: RETRAIT DE LA BENNE ÉTANCHE VOTRE APPAREIL EST ÉGALEMENT ÉQUIPÉ D’UNE BENNE PORTABLE. POINTEZ LA BENNE ÉTANCHE VERS L’AVANT ET ENLEVEZ LES BOULONS. FAITES GLISSER LA BENNE. REMPLACER PAR LA BENNE PORTABLE. ENLEVER LES BOULONS 28 | OPD811 man. v.210223...
Page 29
BOULONS LE PANNEAU ARRIÈRE EN PLACE. ASSEMBLER LES CÔTÉS AVEC CHARNIÈRES, PLIER FERMÉ ET VERROUILLER. UTILISEZ VOTRE POUR TRANSPORTER DES PLANCHES, DES SACS DE SEMENCES, DES SACS EN BÉTON, DU GRAVIER, DE LA TERRE ET PLUS. OPD811 man. v.210223 | 29...
Page 32
OPÉRATION CONSEILS D’UTILISATION APPROPRIÉE CONTRÔLES OPÉRATIONNELS METTEZ LA MACHINE EN MARCHE. CONTRÔLES AVANT ET ARRIÈRE FONCTIONNEMENT DE LA BENNE FREIN 32 | OPD811 man. v.210223...
Page 33
UTILISEZ UNIQUEMENT LE CHARGEUR À BATTERIE FOURNI POUR CHARGER VOTRE UNITÉ. PORTEZ DES CHAUSSURES DE PROTECTION ET SOYEZ PRUDENT LORSQUE VOUS UTILISEZ SUR UN SOL EN PENTE OU GLISSANT. NE LAISSEZ JAMAIS LES ENFANTS UTILISER CET ÉQUIPEMENT. OPD811 man. v.210223 | 33...
Page 35
Entretoise 95x21x25 Réducteur de choc Cadre de roue arrière Couvercle du cadre principal Vis M16x95 Cadre de roue arrière Roue arrière Plaque de recouvrement du châssis principal droit Plaque de recouvrement du châssis principal gauche OPD811 man. v.210223 | 35...
Page 37
ENTRETIEN DIAGRAMME DES PIÈCES: BENNE OPD811 man. v.210223 | 37...
Page 39
(1) an à compter de la date de l’original d’achat. Si un (1) an à compter de la date d’achat d’origine, cet OPD811 échoue en raison d’un défaut du matériau ou (1) un an pour les pièces seulement pour (1) un an sans main-d’œuvre.