Télécharger Imprimer la page
Les langues disponibles

Les langues disponibles

Liens rapides

H-9985
PALLET RACK
FLUE GUARD
TOOLS NEEDED
Electric Drill
#3 Phillips Bit
1.
Slide flue guard onto pallet rack beam.
(See Figure 1)
NOTE: Placement will vary depending on
application.
NOTE: If using wire decking, flue guard should
align so that the wire mesh goes through guard
opening. (See Figure 1)
Figure 1
PAGE 1 OF 3
1-800-295-5510
uline.com
PARTS
Flue Guard x 2
ASSEMBLY
Tek Screw x 8
2. Drill two Tek screws into the top or inside of the pallet
rack beam. (See Figure 2)
NOTE: Two remaining screws are optional and
can be used on the remaining open holes.
Figure 2
Inside
3. Repeat steps 1-2 for remaining flue guard.
Para Español, vea página 2.
Pour le français, consulter la page 3.
Top
0122 IH-9985
loading

Sommaire des Matières pour Uline H-9985

  • Page 3 H-9985 1-800-295-5510 uline.ca BUTÉE ARRIÈRE POUR RAYONNAGE À PALETTES OUTILS REQUIS Perceuse Mèche cruciforme électrique nº 3 PIÈCES Butée arrière x 2 Vis autoperceuse x 8 MONTAGE Faites glisser la butée arrière sur la lisse de 2. Insérez deux vis autoperceuses sur la partie rayonnage à...