2.3. Connect to Utility and Charge
Before installing batteries and chargers, select suitable charging current by switching selector.
Refer to below chart. There are four selections for charging current: 1A, 2A, 4A and 6A.
The charging current of the battery set is about 1/10 times the total capacity of the battery set.
Example:
1 UPS E4 LCD Pro 2000: 1 x 9Ah
2 Battery Bank E4LCD2k-8B9: 2 x 2 x 9Ah
-> 5 rows of batteries 9Ah = 45Ah
Ideal current charge = 45/10 = 4.5A
Current charge of the UPS's charger = 1A
-> 4.5-1 = 3.5A
Adjust the cursor of the Smart Charger S on 4A. In case of doubt about the selection of the
current charge, please call the hot line.
INFOSEC UPS SYSTEM – 4 rue de la Rigotière – 44700 Orvault – France – www.infosec-ups.com
9
Hot Line Tel: +33 (0)2 40 76 15 82 – fax: +33(0)2 40 94 29 51 – hotline@infosec.fr – 10 15 AA 59 203 04