Télécharger Imprimer la page

Zendure SuperCharged Hyper 2000 Manuel D'utilisation page 13

Masquer les pouces Voir aussi pour SuperCharged Hyper 2000:

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 36
6.2 Assembly Process
we can remove this part
Picture
1
Hyper 2000 hybrid inverter x 1
2
3m 10A AC Power Cable
3
AB1000/2000 Batteries
4
M4 Screws x 4
5
M4 Wrench x 1
6
Bracket x 2
8
Solar Panel
9
Solar Panel Extension Cable
10
Solar Panel Parallel Cable
1. Remove the Protective Cover
Use the M4 wrench to remove the battery terminal protective
cover at the bottom of the Hyper 2000.
2. Connect to the Battery
(1) Place the Hyper 2000 hybrid inverter on Zendure Battery
AB1000/AB2000. A single Hyper 2000 can be connected to
up to 4 AB1000/2000 batteries in parallel.
(2) Use the fixed bracket and M4 screws to secure the Hyper
2000 and battery on both sides of the Hyper 2000.
For ease of installation, we recommend making the necessary
cable connections prior to installing your system against a
wall.
Name
Included / Not Included
EN
10

Publicité

loading