During Assembly
Make sure the base is square by measuring the diagonals and level by using a spirit level.
You may use silicone lubricant spray in order to help you slide the panels into the profiles.
Do not spray the polycarbonate panels.
Use a rubber mallet if necessary.
When encountering the information icon, please refer to the relevant
assembly step for additional comments and assistance.
This icon indicates
that the installer should
be inside the product.
Attention
This icon indicates that
the installer should be
outside the product.
During assembly use a soft surface below the parts to avoid scratches and damages.
Steps
Step 5 : If trays are dropping down when filled with soil, push trays'frame up
and tight these screws again on their original position.
Step 26+27 : make sure profiles are inserted all the way till the end into plastic connector.
Steps 29: If lid does not located correctly on the frame it will not closed and opened properly.
Try re -checking Step 22 (measure) and Step 26+27 (insert profiles all the way).
For easy inserting of profile 960 use lubricant material or move lid up and down. Do not use
hammer.
* Please tighten all screws when completing assembly.
.
Screws 411 and nuts 412 are used thruoghout the assembly process.
.
Screws 411 are to be assembled from the outside and nuts 412 from the inside of the
greenhouse.
.
Do not fasten screws and nuts (411 & 412) more than 23- turns only. Do not tighten
them until completion of the panels'assembly, if not specified otherwise.
.
However, in some steps, temporary tightening of a few screws may be needed to
prevent a profile from falling.
Note: Firmly connect the product to a leve surface immediately after completion of the
assembly.
Anchoring this product to the ground is essential to its stability and rigidity. It is required
to complete this stage in order for your warranty to be valid.