Télécharger Imprimer la page

Ribind JOLLY 3P FAST Serie Manuel D'installation page 19

Publicité

Les langues disponibles

Les langues disponibles

PRELEASE KNOB FOR JOLLY ELECTROBRAKE: ASSEMBLY PROCEDURE
1° - Insert the steering compass (B) into the cable (A), as shown in the drawing.
2° - Insert the sheated cable (C) along the cable (A).
3° - Insert the compass (D) onto the cable (A) as shown.
4° - Insert part (E) paying attention that part (F) has been completely screwed.
5° - Insert the compass with the blocking screw (G) against part (F) and tighten the hexagonal screw with a key n° 7.
6° - Fix part (H) with part (F).
RELEASE
To safely carry out the movement of the rolling gate it is important to verify that:
- there are handles on the rolling gate;
- their position does not create dangerous points during the use;
- the manual effort to move the rolling gate must not exceed 225 N for the doors located in private sites and 390 N for the doors located in commercial or industrial sites
(values indicated in point 5.4.5 of EN 12453 standard).
ATTENTION: the activation of the release can cause an incontrollable movement of the rolling gate in case the latter is not perfectly balanced.
MAINTENANCE
To be undertaken only by specialized staff after disconnecting power supply.
Every two years it is advisable to check if the screws of the pulley and the screw fixing to the shaft are tighten.
Check that the springs are properly balanced and lubricate the guide with silicone grease.
ACCESSORIES
CONTROL BOARD J-INV 3P
COUPLE OF HALF BEARING OF REDUCTION
Utilized to mount JOLLY motors 20-22 on shafts of smaller diameter. In nylon.
- Dim. = Ø 42/48
- Dim. = Ø 42/60
- Dim. = Ø 48/60
cod. ABJ0012
19
G
B
8
code ACJ9030
code ACJ9040
code ACJ9050

Publicité

loading

Ce manuel est également adapté pour:

Jolly 20 3p fastJolly 22 3p fastAa00506Aa01512