Télécharger Imprimer la page

Dometic PERFECTVIEW 200VTO Instructions De Montage Et De Service page 12

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 26
Installing and connecting the control box
6
Installing and connecting the control box
6.1
Tools required
For installation and assembly, you will need the following tools:
• Measuring ruler (fig. 4 4, page 4)
• Centre punch (fig. 4 5, page 4)
• Hammer (fig. 4 6, page 4)
• Drill bit set (fig. 4 7, page 4)
• Electric drill (fig. 4 8, page 4)
• Screwdriver (fig. 4 9, page 4)
To establish and test the electrical connection, the following tools are required:
• Diode test lamp (fig. 4 1, page 4) or voltmeter (fig. 4 2, page 4)
• Insulating tape
• Heat shrinking sleeve
• Hot air blower (fig. 4 10, page 4)
• Crimping tool (fig. 4 11, page 4)
• Soldering iron (optional) (fig. 4 12, page 4)
• Solder (optional) (fig. 4 13, page 4)
• Cable bushing sleeves (optional)
To fasten the cables you may require additional cable binders.
6.2
Mounting the control box
The control is supplied ready for installation.
➤ Install the control box in a location protected from water near the monitor, preferably under
the dashboard.
Make sure you consider the length of the cable.
➤ Attach the control box using the supplied screws.
12
SWITCH200VTO
EN

Publicité

loading