Télécharger Imprimer la page

LEGION LIGHTING 136G4 Serie Instructions D'installation page 2

Publicité

Les langues disponibles

Les langues disponibles

Installation on a junction -box
1. Loosen screws on the right side and left side of the
fixture to open the fixture.
3. Locate and drill junction box mounting holes
5. Make wiring connection according to
wiring diagram. Connect LED qick disconnect
and close the luminiare.
Legion Lighting Co., Inc. | 155 Marcus Boulevard, Hauppauge, NY 11788 | Phone: 718-498-1770 | Toll Free: 1-800-4-LEGION | email: sales@legionlighting.com |
2. Disconnect LED quick disconnect connector
4. Pull supply wires through the wall
plate and secure wall plate to
junction box.
6. Remove right side clear cap to select
desired CCT, Lumens output and Sensor .
(see page 4 for gudance)
Page 2
Installation using conduit
1. Secure luminiare to the mounting surface
3. Loosen screws on the
right side and left side of the
fixture to open the fixture.
5.Make wiring connection according to
wiring diagram. Connect LED qick disconnect
and close the luminiare.
Series 136G4
2. Remove left side conduit plug and attach
conduit to the luminiare.
4. Disconnect LED quick disconnect connector
6. Remove right side clear cap to select
desired CCT, Lumens output and Sensor .
(see page 4 for gudance)
Page 3
www.legionlighting.com

Publicité

loading