Télécharger Imprimer la page

Hubbell CFB6G30RE Directives De Montage

Boite 6 compartiments encastree en acier a couvercle rond pour plancher de beton
Les langues disponibles

Les langues disponibles

Liens rapides

5
4
5
5
Wiring Channel Areas Side Wiring
Catalog No.
Page 2
CFB6G30RE, xxRCRE (2) 0.40 in [261 mm ] (4) 33 in [540 cm ] (2) 108.5 in [1778 cm ] 3.75 in [95 mm]
FIGURE
1
Table 1
End Wiring Chamber
Minimum Depth of
Chamber Volumes
Volumes
Pour
6 GANG RECESSED STEEL CONCRETE FLOOR BOX FOR ROUND
7
Catalog no.'s CFB6G30RE, CFB6G30RCRE
CAUTION: RISK OF ELECTRIC SHOCK. Disconnect power before installing or servicing.
NOTICE: For installation by a qualified electrician in accordance with national and local electrical codes, communication
8
standards, the following instructions, and any instruction included with individual devices.
NOTICE: Ensure data/communications circuits are separated from lighting/power circuits in accordance NEC and CE code
requirements.
2
Use with CFBS1R8CVRxx series round covers.
Use with CFBS1R8FFCVRxx series round furniture feed covers. CFBS1R8FF6GDIVKIT partition system required for multi-service
installations.
1
Use with CFBHUB2, 2 in. metallic conduit hubs, CFBHUB125PVC, 1-1/4 in. non-metallic hubs, or CFBHUB200PVC, 2 in.
non-metallic hubs may be used in place of knockout plates as needed.
Use with CFB8RCVRR075 stackable pre pour rings to increase concrete thickness over the box. Each ring adds 3/4" of concrete
over the box.
BEFORE CONCRETE POUR, SEE FIGURE 1
1.
Remove four #8-32 pan head screws [1] from top corners of floor box assembly and retain.
2.
Remove transition [2] and mounting plate [3] assemblies from box and retain.
3.
Make conduit connections in accordance with application and applicable electric codes. 2" trade size conduit hubs,
3
(CFBHUB2) or PVC conduit hubs (CFBHUB125PVC, CFBHUB200PVC) may be used in place of knockout plates [4] as needed.
4.
For same side feed-thru wiring, remove low voltage dividers [5] as necessary.
5.
Reinstall transition [2] on top of the mounting plate assembly [3]. Secure using #8-32 pan head screws [1] in corners.
6.
Cover visible openings and screws that penetrate the floor box with tape to prevent concrete from entering the box.
7.
Install leveling screws [6] as shown in Figure 1. Level box as required, positioning the floor box with the temporary cover [7]
even with slab level. Use leveling screws [6] and wire to keep the floor box from moving during concrete pour. See Table 1
5
for minimum depth of pour.
8.
Verify that flat head screws [8] holding the temporary cover [7] are secure. After tightening, cover screw heads and cover
edge with tape. Grease to aid in removal later.
9.
Pour concrete flush to the top of the temporary cover [7].
10
6
9
Wiring Device - Kellems
Hubbell Incorporated (Delaware)
40 Waterview Dr.
Shelton, CT 06484
1-800-288-6000
www.hubbell-wiring.com
PD-3007
3/23
COVERS - Installation Instructions
CFBHUB2
Conduit Hub
2 in. trade size
(sold separately)
CFBHUB125PVC
PVC Conduit Hub
1-1/4 in. trade size
(sold separately)
Page 1
ENGLISH
3"
3-3/4"
CFB6G30RE
loading

Sommaire des Matières pour Hubbell CFB6G30RE

  • Page 3 ROND POUR PLANCHER DE B TON Directives de montage FRAN AIS Num ros de catalogue CFB6G30RE et CFB6G30RCRE ATTENTION - RISQUE DE CHOC LECTRIQUE. D brancher le circuit avant de proc der au montage ou la maintenance. AVIS - Doit tre install par un lectricien qualifi conform ment aux codes de l' lectricit nationaux et locaux, aux normes de communication, aux directives suivantes et toutes directives jointes aux dispositifs individuels.
  • Page 4 APR S LA COUL E DE B TON, CONSULTER LES FIGURES 2, 3 ET 4. Localiser la bo te de plancher, retirer les trois vis [8] et le couvercle temporaire pour b ton [7]. ATTENTION - Les couvercles pour b ton temporaires sont con us pour emp cher les r sidus de b ton de p n trer dans la bo te pendant la coul e et ne sont pas destin s supporter les charges.

Ce manuel est également adapté pour:

Cfb6g30rcre