Télécharger Imprimer la page

Zycoo SQ10 Guide D'installation Rapide page 4

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 9
1
Use an electric drill to drill 2 holes on the installation wall according to the distance between
the hook holes.
2
Push the anchors into each mounting hole with a rubber hammer, then install the screws.
3
Knock out the necessary hole guard(s) and pass the network cable through.
4
If PoE cable is not used, please connect the power cable to the DC socket through the net
coil or the rear enclosure hole.
5
If there are any buttons, relays, and/or other devices that need to be used. Please connect
them to the phoenix terminal of the J2 connector through the net coil or the rear enclosure
hole.
6
Align the hooks on the rear enclosure with the installed screws and hang it on.
7
Install the front panel onto the rear panel box and tighten with the M4*25mm screws using a
screwdriver.
Reboot & Reset
1
Reboot: Press and hold the IP broadcast button on the front panel for around 10 seconds,
then release. The device will automatically reboot.
2
Reset: Press and hold the reset button on the speaker internal mainboard for around 5
seconds till you hear voice prompts "Resetting factory defaults, rebooting...", now release
the reset button, and the SQ10 speaker will now reset. After recovery, the system light
enters a flash state.
2

Publicité

loading

Produits Connexes pour Zycoo SQ10