Surface Mount Installation - Topaz LVT2-20-CS Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Item:
LVT2-20-CS
LVT4-40-40K
LVT4-50PCS
LVT4-50PCS-EM
LVT4-50PCS-MS
LVT8-70PCS
LVT8-70PCS-MS
LVT-ANGL-MNT
F-LED-CABLE 2PK
INSTALLATION INSTRUCTIONS
4
5
A. Surface Mount Installation
Parts List
1
sleeve anchor
mounting bracket
screw
2
www.topaz-usa.com | 800.666.2852 | ©2022 Southwire Company, LLC. All rights reserved.
LVT4-40-50K
LVT4-50PCS-EMS
LVT8-70PCS-EM
LVT-JBOX-MNT
LED LINEAR VAPOR TIGHT
L
Black
N
White
Green
Dimming
Purple(DIM+)
DC(+)
DC(-)
Pink(DIM-)
mounting bracket*2
5.
Loosen the plastic end cap with a screwdriver, take out the
input wire from accessory bag, and then pass it through the
metal fastener. Tighten the PG joint and connect the input
wire to the corresponding terminal. See Figure 4.
6.
Secure Lens to Housing by clamping Latch down. Be careful
not to pinch the wires. Check that the Gasket is fully seated
before closing.
7.
Connect the electric supply and the AC input wires of the fixture
according to the following wiring instructions. See Figure 5.
WARNING: To prevent wiring damage or abrasion, do not expose
wiring to edges of sharp objects.
8.
Select the appropriate mounting method according to the use
environment (step 5 can be adjusted according to the specific
application and installation method).
sleeve anchor*4
self-tapping screws*4
1.
Drill holes in the ceiling and tap the sleeve anchors in.
2.
Install mounting bracket to the sleeve anchors on the ceiling using
the supplied self-tapping screws. See Figure 1.
3.
Push the fixture into the mounting clips once they are secured to
the ceiling. See Figure 2.
4.
Turn on power.

Publicité

Table des Matières
loading

Table des Matières