Delivery; Installation; Positioning And Clearances; Minimum Clearance - Walter Wilson HYDRA09-E2401M-D Guide D'installation Et Manuel Du Propriétaire

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1.5)

DELIVERY

Upon delivery of the boiler, check the nameplate to be
sure that you have received the model with the correct
rating and proper voltage.
The following items are supplied with the unit:
-
A pressure relief valve, adjusted to 30 psi;
-
A drain valve;
-
A ½" NPT to ⅛" NPT reducer for the installation of an air
purge valve;
-
Modulating outdoor sensor.
1.6)

INSTALLATION

WARNING
The installation of this unit must be performed by
a qualified technician and it must conform to the
standards and regulations in force as well as the
Canadian Installation Code for Hydronic Heating
Systems CSA B214-01.

1.6.1) Positioning and clearances

The unit must be installed in an area that is dry, non-
corrosive, without excessive dust, well ventilated and where
the ambient temperature does not exceed 27°C (80°F).
The boiler can be installed directly on a wall, by way of the
mounting plate, supplied with the unit.
installed level and that the clearances indicated below are
respected (Table 1).
TABLE 1

MINIMUM CLEARANCE

LOCATION
Access side to elements
Other side
Above
Front
Back
1.7)

DISTRIBUTION SYSTEM

The proper functioning of your heating system is directly
related to the quality of the plumbing installation. Therefore,
the entire installation must be performed by qualified
technicians.
See Figure 3, p. 11 for the functions of the various boiler
connections.
The heating system must be set-up to operate at a maximum
pressure of 28 psi and the operating temperature may range
from 32˚C to 99°C (90˚F to 210°F).
4
Ensure that it is
CLEARANCE
0.41 m (16")
15.24 cm (6")
15.24 cm (6")
0.61 m (24")
0"
Freeze protection (when required)
WARNING
Only propylene glycol may be used in this
hydronic heating system, to prevent freezing.
It is recommended to add a maximum of 50% of
propylene
glycol
mixture
operation.
Do not use automotive anti-freeze, ethylene glycol
or any undiluted anti-freeze.
If the above recommendations are not followed,
severe personal injury, death or substantial
property and/or equipment damage can result.
All installations must include the following items:
a.
1 pressure regulator, adjusted to 12 psi, installed
between the boiler and the main water supply in the
building;
b.
1 expansion tank, pre-pressurized to 12 psi and of
appropriate size;
c.
1 or more automatic air purge valves;
d.
1 or more circulating pumps of appropriate capacity.
CAUTION
To avoid water damage and/or scalding due to relief
valve operation, a discharge line must be connected to
the valve outlet and run to a drainage area.
discharge line shall be installed in such a way that it
will allow for the complete drainage of the valve and
the discharge line.
1.8)

INSTALLATION OF THE BOILER

At the time of installation, the following steps should be
followed.
Refer to Figures 3 and 4, p. 11 and 12 for
additional information.
Choose an appropriate location.
1.
securely on the wall, with the help of the mounting plate.
Ensure that it is level and that the minimum clearances
are observed;
Install the drain valve and the safety valve as indicated
2.
in Figure 3;
An air vent can be installed on the unit. In such case,
3.
use the ½" NPT to ⅛" NPT reducer, which is provided;
Install the water supply and and return piping with the 1"
4.
NPT fitting;
The heating supply line must include:
5.
a.
1 circulator along with 2 maintenance valves;
b.
1 automatic pressure reducing valve adjusted to
12 psi, with a shut-off valve on the return water
line;
c.
1 expansion tank;
d.
1 automatic vent.
to
ensure
proper
The
Mount the boiler

Publicité

Table des Matières
loading

Table des Matières