Install Replacement /New Bulb - AVID LABS AVERE 3 WASH Mode D'emploi

Table des Matières

Publicité

Install Replacement /New Bulb

• Loosen the front four bolts by twisting 1 full turn (counter clockwise)
• Fully loosen all four bolts and remove ring
• With care remove the front glass
• Install the GU10 (model depending) bulb, Max 10 Watts
• Place the glass on the o-ring
• Place front cover in position(ensure open side single o-ring is correctly installed)
• Lightly finger tighten the front screws to hold the front cover and o-ring
in position
• Begin torque sequence for the front four bolts:
- Lightly tighten (use an allen wrench and move bolt until resistance is felt)
bolts in 2 stages working in diagonals, start with bottom left and top right,
move to bottom right and top left
- REPEAT this sequence until all bolts reach a torque setting of 6 In-Lbs.
- Ensure the gap between body and front cover is no more than 0.75mm
(0.03"). If a larger gap is present, repeat sequence above until gap is less than
0.75mm (0.03")
AVERE
3 Wash-MR16
®
Exterior Bolts
Torque Settings Drawing
Back
Plate
Holographic
UV Label
LPSHCS
M3 x 0.5 x 12mm SS-BO
Unique lighting solutions.
Chassis
Grounding
Harness
BHCS
M3 x 0.5 x 5mm SS
O-Ring
030 EPDM/FKM
BHCS
M4 x 0.7 x 4mm SS0-BO
Yoke
Internal
Caution Label
AVERE
3
®
MR16 Can
Flat Washer M6
Black Nylon
SHCS M6 x 1.0 x 10mm
SS-BO
12
LPSHCS
M3 x 0.5 x 8mm SS-BO
O-Ring 034
Front Bezel
EPDM/FKM
Glass
LPSHCS
M3 x 0.5 x 12mm SS-BO
GU10 Socket
Assembly

Publicité

Table des Matières
loading

Produits Connexes pour AVID LABS AVERE 3 WASH

Ce manuel est également adapté pour:

Mr16

Table des Matières