Tools And Materials; Before You Begin - Kohler K-15000 Serie Guide D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don't
hesitate to contact us. Our phone numbers and website are listed on
the back cover. Thanks again for choosing Kohler Company.

Tools and Materials

Adjustable
Hacksaw or Tubing Cutter
Wrench
Plumbers
Putty

Before You Begin

Observe all local plumbing and building codes.
Shut off the main water supply.
Carefully inspect waste and supply tubing for any sign of
damage.
Replace waste or supply tubing if necessary.
For new installations, install the faucet before installing the bidet.
Kohler Co. reserves the right to make revisions in the design of
faucets without notice, as specified within the Price Book.
116371-2-AB
Supply Stops
and Tubing
Thread
Sealant
2
Kohler Co.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

K-15000-cp

Table des Matières