Télécharger Imprimer la page

Barrette RDI Serie Instructions Pour L'installation page 4

Panneaux de verre

Publicité

Les langues disponibles

Les langues disponibles

LEVEL RAIL
1.
Place the bottom beam across the opening and
adjust to ensure equal baluster spacing on each
end (Fig. 1). Mark the rail panel at the post face
at both ends of the beam shown in Figure 1.
Measure ¼" from the marks towards the center of
the bottom beam (to allow for bracket clearance,
(Fig. 2) and cut both the top and bottom beams
at both ends using a carbide tip blade of at least
60 teeth.
Ensure support channel is inside bottom beam
(Fig. 3) before cutting; channel is required to
distribute the load of the glass slats along the rail.
2.
Open the paper bracket mounting template
(included with brackets), align base trim with
appropriate guide on template, and secure
template in place using a piece of tape. Pre-drill
through the desired marked locations on the
template using a
align brackets (Fig. 4) with the holes ensuring that
brackets are square, and fasten brackets in place
using the 1½" screws provided.
Press bottom bracket covers onto the ends of
the bottom beam (Fig. 5) and set onto bottom
brackets, pressing in place. Place top beam in
place on top brackets (Fig. 6).
3.
Pivot support foot in place under the rail as shown
(Fig. 7).
NOTE: Secure support foot to the mounting
surface using the 1½" screw provided and press
fit cover into place using plastic plug as shown
(Fig. 8 & 9).
4
/
" drill bit. Remove template,
1
8
4
1
2
3
Top Level
Bottom Level
Bracket
Bracket
Fig. 1
Fig. 2
Fig. 3
Fig. 4
Fig. 5

Publicité

loading