Télécharger Imprimer la page

Oceanic OCEAMIXCG88CR Notice page 4

Publicité

Les langues disponibles

Les langues disponibles

[Drawing part 3]
- Make a first connection test to both find the best positioning of the
hoses in relation to the water inlets and identify the drilling points
on the ground which will be used to fix the support foot.
[Drawing part 4]
- Make sure that the drilling points will not damage the water supply
pipes located under the ground. Mark the position of the pipes
before any drilling. Drill, using a hammer drill, according to the
drilling point marks. The drilling depth must be 4.2 cm so that the
entire screw pitch remains above the ground. A mark on the bit will
allow better control of the drilling depth. Insert the expansion plugs
in the holes.
[Drawing part 5]
- Place PTFE tape (such as Teflon) on the male connectors
on the ground, to ensure watertightness, then screw the hoses onto
these connectors (hot and cold water inlet). If the hoses are too
long, you can accommodate the excess in the flange. Be careful not
to pinch the hose when placing it.
Finally, check the verticality of the assembly when tightening the
foot to the ground with the supplied nuts. Finalize the installation by
sliding the flange to the ground.
[Drawing part 6]
- Connect the shower hose to the Main body and the hand shower.
[Drawing part 7]
- Complete product drawing.
it depends on the position of the pull rod located above the mixer
tap.Depressed
• position = use of the faucet
• Exit position = use of the shower
• To change the flow, raise the lever more or less.
• To change the temperature, turn the mixer knob to the left or to
the right.

Publicité

loading

Ce manuel est également adapté pour:

Oceamixcg88mb