Télécharger Imprimer la page

Steelcase Workplace Advisor Instructions D'installation page 2

Publicité

Les langues disponibles

Les langues disponibles

®
GATEWAY PLACEMENT GUIDELINES
To ensure proper performance, pay attention to the following:
·
CAN BE installed with double-sided adhesive
CAN BE installed out-of-sight (e.g., on ceiling, etc.)
·
·
RECOMMENDED placement is above 7'
MUST HAVE PoE Ethernet connection per gateway
·
·
MUST NOT be installed within a metal enclosure, cabinet, under flooring or in any
housing that will block wireless signal
INSTALLATION
DC IN
LAN IN
1. Locate PoE network connection for gateway.
2. Connect the LAN OUT port on the PoE splitter to the LAN IN port on the gateway using the included 6" Ethernet cable.
3. Connect the DC OUT port on the PoE splitter to the DC IN port on the gateway using the included 6" DC-DC power cable.
4. Connect the 3' Ethernet cable to the POWER+DATA IN port on the PoE splitter.
5. Verify gateway power/wireless/network status by checking the LED Status Indicators.
If everything was installed correctly, the LED indicators should appear as shown.
If any indicators show the gateway is not fully functional, refer to the chart on page 4.
6. Record the gateway serial number and location where device is installed on the installation plan provided by
the dealer so you can use the Device Manager in Workplace Advisor to update gateway's note.
(back of gateway)
Power + DATA IN
LAN OUT
DC OUT
NOTICE
Per (NEC) Electrical Code:
·
·
NOTICE
CONFIRM cables are firmly inserted
VERIFY Splitter O/P switch set to 5V
DO NOT set switch to 7.5V, 9V or 12V
MUST NOT place above ceiling
MUST NOT be installed in plenum-rated
or air-handling spaces
Facility PoE
network port
blinking
solid green
green
Page 2 of 8
1077375001 Rev D

Publicité

loading