Installation Procedure - Toto A Série Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

1. Use the attached template for location and make sure that all the screws
mount into wood studs. A stud sensor or another stud locating method
can be used to locate the studs behind the wall.
Stud,
Back Support
2. Drilling mounting holes.
For Drywall:
• Drill a 4mm (5/32") holes at each marked location.
For Ceramic Tile:
• Drill 8mm (5/16") holes - a minimum of 60mm (2
marked location.
• Insert anchors until they are flush with the face of the finished wall.
• Apply silicone sealant into all drilled holes.

INSTALLATION PROCEDURE

Stud
Mount Location
Stud,
Back Support
Wall Mount Screw
Stud,
Back Support
Mount Location
") deep at each
3/8
Cap Nut
Cap Nut
<Side View>
5
Stud,
Back Support
Hole,
Mount Location
Finished Wall

Publicité

Table des Matières
loading

Table des Matières