Installing Your Dryer; Tools Needed For Installation; See Exhaust Requirements - Samsung DV339AE Serie Manuel De L'utilisateur

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

installing your dryer

TOOLS NEEDED FOR INSTALLATION

Hire a professional to install this dryer properly. If there is a service call performed as a result of poor setup,
adjustment, and connection, it is considered the responsibility of the installer. If you install the dryer you are
responsible.
Make sure you have everything necessary for proper installation.
1. A GROUNDED ELECTRICAL OUTLET is required. See Electrical Requirements.
2. A POWER CORD for electric dryers (except Canada).
3. GAS LINES (if a gas dryer) must meet national and local codes.
4. EXHAUST SYSTEM – must be rigid metal or flexible stiff-walled metal exhaust ducting.

SEE EXHAUST REQUIREMENTS

Control panel
DV339AEW-02571B_EN.indd 7
Door
"Y"-connector
Adjustable legs
Long inlet hose
installing your dryer _7
2009-06-04 ¿ÀÈÄ 6:16:00

Publicité

Chapitres

Table des Matières
loading

Table des Matières