Uline H-8226 Mode D'emploi page 4

Masquer les pouces Voir aussi pour H-8226:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Figure 11
M8 x 65
Hex Bolts
8. Align two holes located on end of each shelf piece
with two holes in support brackets (6). Fasten each
shelf piece to support brackets with two M6 x 15 hex
bolts and two M6 flange nuts using a 10 mm wrench.
(See Figure 12)
9. Recheck and tighten all bolts
PAGE 4 OF 27
ASSEMBLY CONTINUED
Figure 12
M6 x 15 Hex
Bolt and M6
Flange Nut
Top Not Shown
BOTTOM SHELF DIVIDER ASSEMBLY
1.
Four bottom shelf dividers are included with packing
station. To attach, slide shelf dividers between full
depth bottom shelf and 4" high storage shelf and
align with two pre-drilled holes in each shelf. Fasten
each divider with four M6 Phillips head bolts and
four M6 flange nuts using a Phillips screwdriver and
10 mm wrench. (See Figure 13)
Figure 13
UPRIGHT ASSEMBLY
1.
Position upright on back corner of tabletop.
Mounting plate should be positioned directly over
the previously drilled holes. Fasten four M6 x 70 hex
bolts and flat washers through uprights, tabletop
and legs using a 10 mm wrench. Secure with four
M6 flange nuts on underside of table. (See Figure 14)
Figure 14
Upright
M6 x 70 mm
Bolt
Washer
Flange
Nut
Leg
2. Repeat with second upright.
Pre-drilled
Holes
Mounting
Plate
Upright
0521 IH-8226

Publicité

Table des Matières
loading

Table des Matières